Construction Scheduler/Project Manager – Federal Projects

This job posting expired and applications are no longer accepted.
Synergy Professionals, Inc. Published: May 29, 2020
Location
Norfolk, Virginia
Category


Synergy Professionals, Inc.

Synergy Professionals, Inc. is a national construction recruiting firm with offices in Atlanta, GA and Chesapeake, VA. We are devoted exclusively to the construction industry. Synergy Professionals is committed to being the best recruiting service available to our clients and to the candidates we present.

See our website at: www.Synergyprof.com

Description

Highly Respected General Contractor in Hampton Roads is searching for an experienced Scheduler and/or Project Manager who has extensive scheduling experience. The selected candidate should have at least 5-7 years of experience on Department of Defense construction projects.

Projects are vertical in nature and contract values are between $1M -$40M.

 

Qualification Requirements:
• You must have worked as a scheduler and/or project manager who has experience building and maintaining a schedule in Primavera P6 and/or Microsoft Project. Project experience must be on vertical construction while representing a general contractor. Please provide a list of projects/contract value with resume submission. All projects should be domestic. Projects outside of the U.S. will not be considered.
• Experience with creating, maintaining and analyzing schedules, delays and proposing recovery plans. Capable of applying knowledge of applicable local, state, federal statutes and guidelines.
• Candidate must have represented a general contractor in a scheduling and/or project management position.
• Experience as a scheduler or project manager with extensive scheduling experience on federal (Department of Defense) construction projects. Projects should range between $15M to $45M.
• A 4 year degree is preferred.
• Extended travel will not be required, but occasional site visits or business related travel will be necessary.
• Must be able to obtain government security clearance.

 

$90K-$125K/year depending on qualifications
Health care benefits, 401K, vacation, etc.
If you do not currently live in the Norfolk, VA area, reasonable relocation assistance may be offered.

 

 

 

 

keywords: construction jobs, Project Controls, Project Controller, Schedules, Project Coding, Primavera, ,P6, Delay Analysis, Recovery Schedule, Microsoft Project, Project Manager, PM, Schedule, Scheduler, Scheduling, Design Build, Project Controls, Primavera P6, P6, Microsoft Project Army Corps of Engineers, USACE, EM 385-1-1, , CQCM Certified, SSHO, Military, government, federal, NAVFAC, Department of Defense, DOD, D.O.D, Alexandria, VA, Washington, DC. Norfolk, VA, Chesapeake, VA, Suffolk, VA, Portsmouth, VA, Virginia Beach, VA, Langley AFB, Hampton, VA, Fort Lee, Fort Eustis, Dam Neck, Oceana, Ft. Lee, NOB, Norfolk Naval Base, Newport News, VA, Williamsburg, VA, Quantico, NAS Oceana, Naval Station Norfolk, NOB, Portsmouth, VA, Chesapeake, VA, Mackall, Elizabeth City, NC, Alexandria, VA, Washington, DC. Norfolk, VA, Richmond, VA, Virginia., D.O.D., USACE, Army Corps of Engineers, NAVFAC, Airforce, Military, Army, Federal Government, Building Construction, Military Facilities, Vertical Construction, Government Buildings, Government Facilities, construction jobs, Project Controls, Project Controller, Schedules, Project Coding, Primavera, ,P6, Delay Analysis, Recovery Schedule, Microsoft Project, Project Manager, PM, Schedule, Scheduler, Scheduling, Design Build, Project Controls, Primavera P6, P6, Microsoft Project Army Corps of Engineers, USACE, EM 385-1-1, , CQCM Certified, SSHO, Military, government, federal, NAVFAC, Department of Defense, DOD, D.O.D, Alexandria, VA, Washington, DC. Norfolk, VA, Chesapeake, VA, Suffolk, VA, Portsmouth, VA, Virginia Beach, VA, Langley AFB, Hampton, VA, Fort Lee, Fort Eustis, Dam Neck, Oceana, Ft. Lee, NOB, Norfolk Naval Base, Newport News, VA, Williamsburg, VA, Quantico, NAS Oceana, Naval Station Norfolk, NOB, Portsmouth, VA, Chesapeake, VA, Mackall, Elizabeth City, NC, Alexandria, VA, Washington, DC. Norfolk, VA, Richmond, VA, Virginia., D.O.D., USACE, Army Corps of Engineers, NAVFAC, Airforce, Military, Army, Federal Government, Building Construction, Military Facilities, Vertical Construction, Government Buildings, Government Facilities.